Projects

An assortment of constructions, expansions and refurbishments for both businesses and residential endeavours.

Commercial & Industrial

Crown Paints Limited

Value
£430,000

Location
Hull

Duration
15 weeks

A new Client for Thompson Construction, the contract was to extend their existing storage warehouse to one side which would house their new fleet of electric powered forklifts.

We knew that we had challenges with the contract, right from tender stage to completion with, overhead power lines, high water tables, untraced existing drainage runs and levels to the existing site, but we over came all of these and built the client exactly what was requested, all within the budgets & programme dates.

Main works consisted of steel frame with composite cladding, new up & over doors and power floated floor, due to the existing site having bad ground piling was required as well as ground beam reinforcement and slab reinforcement.

Internally due to the end use of the building to charge electric vehicles the spilt from old to new had to be 1 hour fire protected.

Overall a great project to contracted to build.

Hastings Medical Centre

Value
£300,000

Location
Hull

Duration
20 weeks

The first medical centre for us and we really enjoyed extending the existing surgery and fully renovating the existing building to produce a magnificent doctor’s surgery where more patients can be seen due to the surgery’s growth.

Two extensions, internal structural alterations, full Plumbing, electrical, fire, CCTV, Intruder and nurse call system with drainage diversions, External carparking all to bring the building up to modern standards.

A very tight a tricky site to work on and manage but we over came this to hit all targets and deliver a great building for this new client.

Bee Health Ltd

Value
£400,000

Location
Carnaby Bridlington

Duration
17 weeks

Another Repeat client & with very tight deadlines throughout, scope of works was to build a new industrial unit which would be their new Drying tunnel, which would connect onto the existing building from both ends and would have a mezzanine first floor for the plant.  The building was steel framed, cladding, concrete floor, internal hygienic cladded walls and ceilings with resin floors, complete with full power, lighting and fire detection, all to meet their needs to manufacture & package vitamins, minerals and food supplements worldwide.

Additionally, to the project there was another phase of the work which was included while our team was on site, the first-floor Vegan rooms with ground floor adaptions and alteration within part of the existing factory.

The project was very demanding on hygiene due to what they do daily with all work having to be coordinated to suit their needs and shutdown timescales, nevertheless we collaborated and completed the project for them.

Swift Holdings (UK) Limited

Value
£2,300,000

Location
Cottingham

Duration
Project ongoing

Thompson Construction were contracted to build an extension of the existing production unit extending it by another 60, 000 Sq. Ft.  The project was completed under JCT Design & Build.

The new extension was of a portal frame type sat on pad foundations, complete with composite roof cladding complete with a man safe system to the roof and a built-up cladding system to the walls.  The structural concrete floor was designed and installed to FM2 as per the clients’ requirements, to each gable end of the building we installed large roller shutter doors to assist with the production line of caravans been moved through them upon completion.  Externally comprised of a tarmac finish, Armco safety barriers and a new surface water drainage system.

Swift Holdings (UK) Limited

Value
£1,480,000

Location
Cottingham

Duration
26 weeks

Thompson Construction built a new 10,000 sq. Ft. building for a new client, the building comprised of a new commercial kitchen, toilets, and a large open plan seating space for the employees for Swift Caravans.

Attached to the building was a great outdoor space for ‘alfresco eating’ covered with Brise Solaire for them summer months. The project was completed within the budgets set out by the client and within the programme constraints to allow them to open to the staff.

Heald Limited

Value
£500,000

Location
Hornsea

Duration
22 weeks

This project was to create an additional manufacturing space for a repeat client who are an industry leader for security bollards and defence barriers. We built a new 20,000 sq. Ft industrial unit, this consisted of 90 percent of the building for manufacturing with the remaining 10 percent for a new welfare area and office space. The external requirements where for a concrete yard and an attenuation pond for all the sites surface water.

Farmhouse Potato Bakers

Value
£660,000

Location
Carnaby Industrial Estate, Bridlington

Duration
20 weeks

This build was very challenging due to the ground conditions been very poor and the fall of the land it was built on, along with the client that must remain running constantly 24/7 during the build process. The building was built between two existing units which both has different floor height. Within the new building which was 4,600 sq. ft was a new storage and racking area, new welfare area and new production area, this area included hygienic walls, walk on ceiling and a new Ucrete floor with concrete plinth upstands.

Overall, the project was challenging but we managed to meet all expectation set out within the pre-construction meeting with the client.

Motor Depot

Value
£320,000

Location
Handsworth Road Sheffield

Duration
12 Weeks

We had been contracted to undertake work to two depots one of which was Sheffield, the projects brief was to refurbish the existing building which used to be an existing garage for a well-known car manufacturer. Our works included, refurbishment of the workshops, new and existing roof work, new and refurbishing office space, new and refurbishing welfare areas and parts room, we extended the front of the building to give it a more modern look also in keeping to the corporate colours of Motor depot, this space became the new showroom and sales room.

Many changes were made through out the project consequently resulting in the contract increasing in scale drastically. All built to the clients dates ready for their opening day for sales.

Motor Depot

Value
£360,000

Location
Barnsley

Duration
12 Weeks

Another repeat client for Thompson Construction, this project was to build an internal 10, 000 Sq., Ft industrial unit within an existing industrial unit, this would create a new workshop with car ramps to it along with preparation bays, offices, and welfare facilities for the mechanics.

To the opposite end of the building, we extended the sales area building in managers offices and then fully fitting out the offices including Mechanic and electrical, Flooring, Fire rated glazing ceilings and decoration.

Leisure Electronics

Value
£348,000

Location
Hull

Duration
20 Weeks

A new client for Thompson Construction, we were challenged to a tricky 2,200 sq. ft extension to the existing industrial unit, access was very limited, along with the presence of all utilities within the building footprint.  We installed a new mezzanine floor to create a new first-floor storage area for the client’s stock.

Within the existing building we installed a new first-floor office space over the existing ground-floor rooms, this was 3000, sq., ft of offices, kitchen break-out area, glazed partitioning and green rooms for live bingo calling.

Refurbishments & Fit outs

Jenneson Thompson Investments Ltd

Value
£180,000

Location
Hull

Duration
16 weeks

The alterations & refurbishment of two properties which were knocked into a large grade A office space including modern break-out areas, board room, themed offices and a new internal modern staircase to meet the requirements from building regulations, all which was set over two floors with a third floor added within the existing roof space, each of which were fitted out to the clients design and end users requirements.

Overall project was within the budget and met all required dates.

Jenneson Thompson Investments Ltd

Value
£174,000

Location
Hull

Duration
14 weeks

Thompson Construction were appointed to undertake the internal alterations and refurbishments of this 120-year-old property in central Hull.  The scope, to internal remove all walls and staircases, and seperate the two floors, open the building to the neighbouring property, install a new first floor access and internally fit out each floor to a Grade A office specification.

Thompson Construction currently occupy part of the ground floor as their head office.

Horncastle Group

Value
£360,000

Location
Hull

Duration
16 weeks

Thompsons fully fitted out this existing building, which was left by the developer as a shell, the fit covered three floors with a total of 30,000 sq. ft of offices, meeting spaces, kitchen / break out space and recreational areas.

Arco/RFD

Value
£120,000

Location
Hull

Duration
12 weeks

Thompsons were commissioned to build new office, welfare & training spaces complete with a new retail & storage area due to the clients existing premises being demolished.

Residential Projects

Mrs Eman Allam Forster

Value
£520,000

Location
Cottingham

Duration
40 weeks

Our client instructed us to build two new bungalows on the site and to refurbish & extend the existing flats to a more modern space.

The project was particularly difficult due to the steepness of the site and the proximity of the surrounding properties.

Allenby Commercial ltd.

Value
£152,000

Location
Welton

Duration
30 weeks

This was a new build with a twist, the property was a detached building with a large garage to 90% of the ground floor which allowed the safe storage of a motorhome which had a through access from front to back, the ground floor was lowered to allow the height of the motor home to access the space easily.

The first floor was a modern two-bedroom flat with an external balcony, all completed to a high specification.

Mr & Mrs Heald

Value
£212,000

Location
Kelk

Duration
20 weeks

Thompson Construction refurbished this stunning house to the ground floor, originally a combination of rooms complete with a swimming pool. The pool was turned into a cinema / chill-out room, and above was the open plan living space complete with changing facilities due to the family being lake side.

Mr & Mrs Carmichael

Value
£333,000

Location
Elloughton

Duration
Ongoing

This build was a conversation of an existing Coach house, Thompson Construction had to undertake significant restoration works to the building to make this safe and adaptable, underpinning, damp proof treatment and lime mortar repointing was just and hand full of these restoration processes.

Thompson Construction then added to the building creating a new four-bedroom house, the house has a fantastic feature, open plan feel to the kitchen space showing off ground floor to first floor ceilings and oak beams and trusses throughout. internally the clients wanted to keep it modern but with features that would stand out and look like those of the original build.

The project saw renewables installed on the house in way on solar panels and air source heat pump complete with an EV charge point for future use.